Wrapping up 2013!

IMG_0416 IMG_0415The kitchen loft decking is complete!  It’s big enough to dance on (there just aren’t any stairs)!

Read Full Post »

IMG_0377 IMG_0379The Heat Exchanger will be warming the basement radiant system.  One day, at 47 degrees, it was too warm to work with coats on!

Read Full Post »

IMG_0418 IMG_0422 IMG_0423 IMG_0420

Read Full Post »

The Fire Within!

Fire IMG_0383

Read Full Post »

IMG_0362It seemed to take forever, but we finally got the south enclosed (we’ll install the window frames and finish cordwood in the spring).  Now that the space is enclosed, we are starting to connect the masonry fireplace heat exchanger to the in-floor radiant heat for warmer interior winter work.

Read Full Post »

IMG_0351 IMG_0349 IMG_0350

Read Full Post »

IMG_0346 IMG_0353With rehab activities and early cold weather, we didn’t quite get the south side masonry work finished.  We did, however, fill in the gaps with plywood which enabled us to be tarp-free and keep the weather out.  Spring masonry work should go quickly as all the scaffolding is up now!  (You can’t imagine how much fun that is with heights to 30′ and mixed scaffolding units.)

Read Full Post »