Feeds:
Posts
Comments

Archive for February, 2017

Kim has planned extensively and worked hard on this project.  It has come quite a ways, taken a considerable amount of time (one wants to do these things right), and soon will be able to demonstrate its purpose.  I couldn’t wait until it was finished to post.  Stay tuned for future photos which will display the finished product in all its glory!  Here is a teaser!20170218_142437 20170218_142346 20170218_142339 20170218_142608

Advertisements

Read Full Post »


20170218_14185720170218_14192820170218_14184220170218_142111Tin ceiling tiles finish the fireplace corner prior to wood elevator completion.  See the crack in the flooring?  That has been cut for the wood elevator!

Read Full Post »

Ventilated, will have concrete door, will store food and long-term supplies.  Qualifies as 2nd finished room (or nearly so)!20170218_142242 20170218_142232 20170218_142204

Read Full Post »

Baseboard Work …

20170218_143856 20161101_094048 Poured concrete – takes care of two problems … easier to contend with uneven surfaces, AND fills in gaps which would collect all kinds of things one wouldn’t want!  Additionally, it provides a straight durable edge for flooring, etc.  Can be painted or stained to match room decor.20161101_094156 20161225_111411 20161225_111711

Read Full Post »

Master Bedroom Wall Work

Living Room Side = White Wall20170218_141916 20170218_142001 20170218_141946

Read Full Post »

Loft Floor Finishing

Patched, sanded, stained and floor finish added.  Another first for me (Roberta).20170218_141731 20170218_141626

Read Full Post »

Kitchen wall

Kitchen green board installation: stud framing, denim insulation, finish!  Window trim will go on later.  Process is in preparation for laying of first floor floors!20161225_105546 20170218_142035 20170218_142030

Read Full Post »

Older Posts »